Version 19

 
GISNET: Global Information Systems and Network-Efficient Toolsets for Data Intensive Science

Submitted to NSF/CISE: “NeTS”

January 21, 2005 NOON

Version 10: January 17

1.        Updated Optical Testbed Section C3.6 (SR)

2.        Added Section on the InLab Extension. Need to get Cisco’s ok to release more widely to the UltraLight list.

3.        Added important 2nd paragraph from Xun on Network Research to Summary and C.1

4.        New C.2 from Steven and Xun. More work to integrate C2.1 – C 2.3 to follow in V11

5.        Paragraph on  In Lab from Steven added to C.4.Sections C 4.1 and 4.2 need work

6.        V10 is now a bit overlength..

Version 11: January 18

1.        New Section C3.5 from Sylvain. Needs to be reworked.

2.        Shortened WIL part & reworked C.4

Version 12: January 18

1.        New Section C.2 from Xun, integrated by HN

2.        Senior Personnel Names Changed (Shawn)

3.        Fixed Figure Numbers + TOC (HN)

4.        1st draft of C9.2 Work Program; needs more development to cover what is in the proposal

5.        Start on NSF Prior Results Section; Need more contributions. Also Senior Personnel who are PI or Co-PI on another NSF-funded project.

Version 13: January 19 AM

1.        New 1 Page Summary; Shortened C.1 (XS+HN)

2.        E&O Updates to Summary and New C.10 (LK+JI)

3.        Refs. In C2.3 and C 3.6 (XS+HN)

4.        Updates to WIL Plan in C.4 (CS+HN)

5.        Reference List replaced (CZ); Left old list also there . 

Version 14: January 19 PM

1.        C.7 moved out to Facilities document, not in main text. Length of Project Descriprion now 15p.

2.        Added one line to C2 from Xun

3.        Slight changes to C4.2 to emphasize optical switch

4.        Juggled Fig. 5 pos’n (not ideal) to save space.

5.        Added Prior Support for Whitney; Need Ranka’s.

6.        Corrected Namelist.; Cleaned up headings

7.        Slight changes to Summary

Version 15: January 20 AM

1.     Added connections to GLIF, SURFnet.

2.     Cleaned up the references, typos.

3.    Need to finalize namelist and get prior result from Sanjay

Version 16: Jan 20

1.        Accept all changes so far

2.        Description of GISNET teams structure

3.        Rationalising references

4.        Ranka prior

Version 17: Jan 20

1.        Small typos fixed

2.        New diagrams from Charles at Cisco

Version 18: Jan 21

1.        Shawn mods

2.        Remove “IP” in Section C2

Version 19: Figure removed, font fixes.

 

Version 1: Jan 5

1.        First version based on UltraLight proposal

2.        Replace Summary&Description with Harvey’s.

3.        Replace eVLBI with Alan Whitney’s text

4.        Global edit UltraLight -> GISNET

5.        Shorten LHC physics description

6.        Add Steven Low’s network material

7.        Remove most other UltraLight text

Version 2: Jan 9

1.        Start to flesh out some of the ideas.

2.        Reorder material

Version 3: Jan 10

1.        Additions from Iosif

2.        Material from Xun on SOSTools

3.        Material from Les on mgmt. & ops.

Version 4: January 12

Begin new orientation towards Network Research

1.        Paragraph on the potential impact (HN)

2.        List of some of the “System Challenges” (HN)

Version 5: January 13

1.        Network Research section added by Steven, temporarily in the Summary.

2.        Integrated and adapted new E&O Section from Laird Kramer.

Version 6: January 13, 11:30 PST

1.        Extended Project Summary reworked (HN)

Version 7: January 14, 16:00 PST

1.        Accepted all changes (JB)

2.        Revised section ordering and headings (JB)

3.        Added target page counts (JB)

4.        Juggled content to better fit new mission (JB)

Version 8: January 15-16

1.        Reworked Summary and C.1; needs more work on E&O

2.        Put outline of Distributed Systems Research
Program in C3.1

3.        Reworked Monitoring section C3.2

4.        Replaced and reworked C3.3 on Global Services, and C3.4 on end-systems, with inputs from Iosif and Julian

5.        Replaced and reworked C.5 on the LHC Science Focus.

6.        Inserted an Optical Control Plane part (still rough) from Xun in C3.5

Version 9: January 17

1.        New Network Research Section (SL, XS, HN)

2.        Changes to Section C3.6 on the Optical Control Plane (HN) and elsewhere in C.3

3.        Revised e-VLBI Science Focus Section C.6 (AW)

 

 

 
 

 


 


Senior Participants (ALL NAMES TO BE CONFIRMED)

Caltech

·         Julian Bunn

·         Philippe Galvez

·         Iosif Legrand

·         Steven Low

·         Harvey Newman (PI)

·         Sylvain Ravot

·         Michael Thomas

·         Frank van Lingen

·         Conrad Steenberg

·         Xun Su

 

University of Florida

·         Rick Cavanaugh

·         Alan George

·         Chris Griffin

·         David Pokorney

·         Sanjay Ranka

 

Florida International University

·         Heidi Alvarez

·         Julio Ibarra

·         Laird Kramer

University of Michigan/MERIT Networks

·         Shawn McKee

·         Laurence Kirchmeier

·         John Vollbrecht

Haystack/MIT

·         Alan Whitney

 

Internet2/UCAID

·         Steve Corbato

·         Matt Z.

 

Stanford Linear Accelerator Center

·         Les Cottrell

 

Fermi National Accelerator Laboratory